Asbestos Roof Encapsulation

Liverpool
|
7530m2

Access to the building was needed on a 24 hours a day. GLS Coatings offered a solution which allowed customers full access to the site, while fully complying with the Control of Asbestos Regulations 2012.

View Case Study

Denmark Hill Hospital

London
|
520m2

Water ingress was occurring in the building through the rusting bolts that held the asbestos sheets in place. This had also allowed small movement of the asbestos sheets causing cracks to form.

View Case Study

TRB Tokai Rika Group

St Asaph
|
2876m2

During the site inspection, it was discovered that water penetration was occurring at the verge/ridge of the roof area and where the roofing sheets’ rubber sealing joints had failed.